Byerwen operations
- Location
- Bowen Basin
- Country
- Australia
- Commodity
- Client
- QCoal
- Duration
- Scope
- O & M
- Tags
The initial operation of the crushing and stockpiling, which commenced in December 2017, continued into the train load-out operations once construction was completed in January 2018.
The Byerwen facility comprises a bypass crushing circuit, Sedgman designed and constructed 550 t/h CHPP facility and a Train Load-Out facility. The facility produces both metallurgical quality coal and thermal coal products. The proposed Byerwen Phase 2 project is due to be completed, which will essentially duplicate the CHPP processing infrastructure at the Byerwen site.