Byerwen operations

Location
Bowen Basin
Country
Australia
Commodity
  • Coal
Client
QCoal
Duration
Scope
O & M
Tags

The initial operation of the crushing and stockpiling, which commenced in December 2017, continued into the train load-out operations once construction was completed in January 2018.

The Byerwen facility comprises a bypass crushing circuit, Sedgman designed and constructed 550 t/h CHPP facility and a Train Load-Out facility. The facility produces both metallurgical quality coal and thermal coal products.  The proposed Byerwen Phase 2 project is due to be completed, which will essentially duplicate the CHPP processing infrastructure at the Byerwen site.