Supreme Energy Rantau Dedap Geothermal
Our works included the physical works necessary to allow the geothermal exploration drilling program to be undertaken, which includes:
- Upgrading the 3m width of existing public road from Kota Agung to Tunggul Bute (12.7km)
- Construction of 12-km gravel-surfaced new access road from Tunggul Bute to Rantau Dedap and from Rantau Dedap to Facility Area including various culverts, drainage channels, and slope facings along the road
- Construction of 23km gravel-surfaced new access road from Facility Area to well pads, including various culverts, drainage channels, and slope facings along the road
- Construction of gravel-surfaced well pads at 4separate location, including HDPE-lined sumps and fencing for preparation of drilling works
- Water supply system including water intake, 17km of 200mm CS on-ground pipeline, pumps and break tanks for water supply to well pads
- Laydown area for pipe yard and Steel structural building for warehouse and cutting waste bunker
Details
Location
Muara Enim, South Sumatera, IndonesiaStatus
CompletedSector
ResourcesExpertise
Roads